Description
The works carried out under this contract comprised of the construction of a 3-storey bus maintenance depot with a six storey office above. The overall size of the building is approximately 116.00m x 121.80m on plan.
The reinforced concrete structure is covered by ceramic tiles and coloured spray painting finishes to create a contrast in colour and form.
The main entrance façade is cladded with aluminum panels from top to bottom. W Hing completed the whole work within the 12 months construction period.